The Site
The office development exists around a central lawned area with flagstone surround to the courtyard. Vehicular access is via an entrance at the south-west end of the site to the communal parking area providing in excess of 50 parking spaces.
|
sq m |
sq ft |
Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6 Unit 7 Unit 8 Unit 9 Unit 10 |
122 88 127 102 156 148 85 78 28 88 |
1315 945 1370 1100 1680 1600 915 840 300 950 |
| |
|
Specification
Exterior
-
Roof : Natural slates
-
Glazing : Power coated aluminium (grey) set flush with slate to roof lights
-
Windows : Large sectioned treated softwood with glazing, stained with blue/green/grey staining
-
Doors : Softwood doors and frames, chunky style, with bordered doors (all glazed and stained)
-
Walls : Natural stonework
-
Fascia Boards : Softwood treated and stained (slate grey)
-
Rainwater Goods : Galvanised gutters and downpipes
Interior
-
Floor : The sub floor will be of concrete with damp proof course including vertically injected DPC by specialist, with guarantee, over laid by timber flooring. Upper floors will be of tongue and groove flooring on steel floor joists with plasterboard and skim ceiling finish
-
Toilets : Each unit will be provided with a disabled toilet
-
Kitchens : Each unit will be provided with a kitchen facility
-
Power : Each unit will be provided with a single phased capped supply
-
Water : Water will be supplied to each unit, drainage will be to new septic/mini treatment plant
-
Phones/Computer : Phone and broadband connections are available to each unit
Environmentally Friendly Heating
Each office is heated using an environmentally friendly EarthEnergy™ ground source heat pump system. The system extracts heat from the ground, raises its temperature and transfers it to the underfloor heating or radiator system within the building. The heat in the ground is a natural resource which is continually recharged by the sun. It is a non polluting energy supply.
|